Dates provisional. Recalled rather than sourced — to be confirmed against the record.
Four posts over nineteen years: Senior Network Engineer from April 2005, Network Infrastructure Manager from August 2006, Chief Technology Officer from January 2008, and Senior Enterprise Architect from March 2010 to January 2024. Four posts and five Chief Information Officers — the governance work outlasted every executive who commissioned it, which is the practical case for writing a thing down rather than holding it in a relationship.
Consolidated city-county government — the largest US city by area at 840 square miles — with 8,000 to 9,000 employees, 220-plus locations, 300-plus applications, two data centers, 6,500 endpoints, 6,000 telephones, 1,100-plus network devices and a 10,500-radio public safety fleet, on a $48M to $62M annual technology budget. Organizations of up to 89 staff.
Recruited out of the consultancy by the client: the City hired directly from Coleman Technologies in 2005, after several years delivering its projects as a consultant. Not a requisition filled off a job board — retaining the person who already knew the estate. What was being bought was the combination rather than any one part of it: the technical depth to make architecture decisions and defend them, the grasp of how the business processes underneath actually ran, and the ability to put both to an executive audience in terms a non-technical decision-maker could act on.
What made it demanding was the structure rather than the size. Consolidation merged the governments; it did not merge the technology.
Five countywide constitutional officers were elected independently of the Mayor: the Sheriff, the Clerk of the Circuit Court, the Property Appraiser, the Tax Collector and the Supervisor of Elections. The State Attorney and the Public Defender were elected for the Fourth Judicial Circuit and answered to the state. The courts were a separate branch again — a circuit judiciary whose chief judge is chosen by its own judges. Inside the City proper, Fire and Rescue, Public Works and the library system each held their own budget and their own IT staff.
Several ran substantial technology organizations of their own, the Sheriff’s Office among them. But the charter put the City’s technology division in a governance role across all of it — the independent authorities aside, which stood outside it: JEA, the aviation and transportation authorities, and the school board. And every one of the rest also had some part of its estate running on the City’s. That is the shape of the problem and the reason it was interesting: a charter remit over bodies nobody in this building could direct, and shared infrastructure underneath all of them.
Nothing published could be mandated to any of them.
Moving from the executive chair into the architecture group
The 2010 move was into a newly created enterprise architecture group, as its Senior Enterprise Architect, after three years in the Chief Technology Officer post and, before that, Network Infrastructure Manager and Senior Network Engineer. The group held technology governance for the City and its independent constitutional agencies, and the liaison relationships ran outward from it to the other public bodies in the region — the Sheriff’s Office, the electric utility, and the transportation, port and aviation authorities.
The instruction that shaped it came from the Chief Information Officer during the CTO tenure: manage by influence rather than by managing people. The line organization had already been run — up to 89 staff as Network Infrastructure Manager — so this was a decision about where the leverage sat, not a ceiling. In an estate where nothing could be mandated, it was also the only kind of leverage available.
Leaving an executive post for an architecture group reads as a step down on an org chart and was the opposite in practice. The CTO chair sets direction; the architecture group is where a standard either becomes real across seven independently governed organizations or quietly does not. Moving was a move toward the work.
On the division’s national recognition
Projects architected here featured in the submissions behind the technology division’s national recognition under the City’s Chief Information Officer: third in the United States in the 250,000-plus population category of the Center for Digital Government’s Digital Cities Survey in both 2013 and 2014, the 2014 Jacksonville Business Journal BizTech Innovation Award, selection for the 2015 CIO 100, and the 2012 Government Computer News award for JaxReady, the City’s public emergency preparedness application.
The CIO 100 was awarded for Comprehensive Performance Management, the business intelligence and performance management platform whose architecture direction and standards sat with the enterprise architecture group.
Stated with its limits, because the limits are the honest part. The recognition was the organization’s rather than any individual’s, and the CIO 100 submission was led from elsewhere in the department. What is claimable is narrower: the survey responses were built from the portfolio, and the work owned here was in them.
Whatever the title on the door, the escalation path for a hard problem ended here for nineteen years — the core network was led from this desk, and the troubleshooting call for any system came to it. The Enterprise Security Committee, chaired here from 2009 to 2012, functioned as the enterprise architecture review board in the years before the City had a Chief Security Officer. Alongside it, and outlasting it, the Architecture Technology Governance Committee ran from 2008 to 2021 — the body where architecture decisions were actually worked — succeeded in November 2021 by the Architecture Review Board, which carried capital planning and a budget as well as architecture. Every standard either issued was adopted voluntarily by people who were free to decline.
Projects in this period
Carried into the period
- City Council Chamber AV and IT ArchitectureAudio, video, voting and broadcast systems for a chamber where proceedings are a public record — owned for twenty-one years.
- First Coast Radio SystemRegional shared public safety radio across three system generations — original, retrofit, and full P25 replacement.
- The Utility Relationship: Twenty-Five Years, Two EmployersSubject-matter expert to the same municipal utility from October 1999 to January 2024 — first as its consultant, then as the City's counterpart to it, because JEA is an authority under the city charter.
- Enterprise Change Management StandardA change process designed for a utility in 1999, carried into the City as its enterprise standard, and handed to operations in 2012 — after which it outlasted both commercial platforms bought to run it.
Senior Network Engineer (Apr 2005 – Aug 2006)
- Enterprise Core NetworkThe city's core network across nineteen years — architecture, standards and, when it mattered, hands on the equipment.
- Enterprise Audiovisual-over-IP FabricFive sites on one fabric across eighteen years — Council, the Emergency Operations Center, the Ed Ball backup rooms, the Cecil Field backup 911 facility and a youth services agency — so a room stopped being a closed system.
- Citrix Published Application EstateEighteen years, five platform generations and roughly 4,000 billed seats — with a per-seat price an agency could argue with.
- Enterprise Web Filtering and Content SecurityEighteen years and five vendor generations, split two ways between a government workplace and a public library on the same infrastructure.
- Jacksonville Public Library NetworkEighteen years and two full redesigns of a central library and its branches, from the Main Library's opening to the carrier handoff.
- Public Access Wireless ProgramFourteen years and four program names — JaxWiz, municipal Wi-Fi, public wireless, Downtown Wi-Fi — from inheriting somebody else's pilot to a signed, mapped downtown build still being extended four years later.
- Municipal Fiber PlantCitywide outside plant built as interlocking rings, designed down to conduit, manhole, slack and splice.
Network Infrastructure Manager (Aug 2006 – Jan 2008) · Up to 89 staff
- Jacksonville Intelligent Transportation SystemCommunications and network infrastructure across more than one thousand signalized intersections for a consolidated city-county.
- Enterprise GIS PlatformSeventeen years of architecture authority over the City's geospatial estate — and the record of it is a capacity and availability record rather than a mapping one.
- Port-Level Authentication: The 2006 PositionAn argument made in 2006 that securing ports by MAC address was not the answer — held across four platform generations, and in production fifteen years later by a route other than the one proposed.
- JTA and Downtown Transit ConnectivitySeventeen years on the boundary between two public agencies that could not direct one another — first as the city's architecture review on transit proposals, then as owner of the interconnect itself.
- Library Wireless ProgramFrom reported dead spots to an engineered coverage program, on an estate where the wireless carried staff safety devices.
- Requirements or Findings: When Architecture Gets CalledThe same function with the same authority produces requirements on one capital program and findings on another — and the only variable is whether the project called it before or after the build.
- Administrative Identity for the Network EstateSixteen years and three platform generations of who may type a command on a city switch and what is recorded when they do — begun as a procurement condition in 2006, closed with multi-factor and a duty-separated account standard.
- Enterprise Traffic Management PlatformSixteen years on a platform chosen for what it could be programmed to do rather than what it did on the day — bought as a server proxy in 2006 and ending as continuity infrastructure.
- Emergency Operations Center ActivationsSeven activations keeping public-safety and EOC systems available under hurricane conditions — in Logistics from 2006 and as the division's Emergency Coordination Officer from 2008 — with each after-action review fed back into the architecture.
- ITD Continuity of Operations PlanA two-hundred-page all-hazards continuity plan whose first instruction is to skip the plan and go straight to the appendices.
- Automated Asset Tracking ProgramNine years carrying the asset tracking agenda across two titles, argued on billing accuracy rather than loss prevention — and ending in a position and a scoped proof of concept rather than a deployment.
- Automatic Vehicle Location ProgramA transit and traffic system that became a public works and code enforcement fleet estate — 167 units across thirteen divisions, owned from the transport underneath it to the strategy on top.
- Internet Perimeter Firewall ReplacementAn unsupported, undocumented Check Point estate replaced with firewall blades in the core — held as a stated performance objective, carried from written justification to floor-by-floor cutover, with no vendor producing a design at any point.
Chief Technology Officer (Jan 2008 – Mar 2010) · Line organization
- Main Data Center Physical Connection LayoutThe as-built record of every port, patch and strand in the main data center — a naming convention where the identifier is the location, carried to revision 21 over fifteen years.
- Enterprise Architecture ProgramThe EA practice itself — business, information, technical and solution viewpoints, with strategy, assessments and multi-year capability roadmaps for a platform shared by agencies that answered to different elected officers.
- Enterprise Asset and Work Management PlatformFifteen years and two titles on a platform carrying several lines of business and two outside agencies — stood up as a governed project, fed from the systems that knew the truth, and split in the chargeback model.
- Downtown Campus Distributed Antenna SystemA neutral-host DAS carrying four commercial carriers, public safety radio and Wi-Fi — owned across two full platform generations.
- The Capital Project Evaluation MatrixThe weighted scoring instrument behind the City's technology capital funding — and the single workbook built in March 2009 that was still deciding a security product purchase fourteen years later.
- Enterprise Packet Capture and Network Forensics PlatformFull packet capture on eight critical-path points, owned across thirteen years and two platform generations, with retention pushed past thirty days.
- Juniper Enterprise Security SuiteA security platform rather than a firewall — selected on an instrument written before anyone knew who would win, operated for twelve years, and retired in stages on a plan the same team wrote.
- Architecture Technology Governance CommitteeThe second governance body, and the one where architecture decisions were actually worked — with the operations and delivery teams in the room rather than only architects.
- Records Retention and Disposition StandardsClassification, retention and defensible disposition under Florida public records law, across an estate where criminal justice records, patient information, court records and elections data shared one platform.
- Enterprise Firewall Policy and OperationsEight years running the rule base directly across two platform generations — every rule, change and upgrade — then handing it down to a dedicated post rather than holding it.
- Emergency Vehicle Signal PreemptionITS integrated with vehicle location so responding apparatus could clear the route ahead of them.
- Student Capstone Security Engagement and College PartnershipsA student team given scoped authorization to penetration test the live city estate — and a written response to their findings, taken to a second revision, rather than a thank-you note.
- Enterprise Security Committee and Governance ProgramThe city's enterprise architecture review board, chaired and chartered — and, in the years before the City had a Chief Security Officer, the body where security policy was set.
- Duval County Courthouse Technology ProgramA $12M IT program inside a $350M, 800,000 square foot capital facility, cut over live to a fixed date.
Senior Enterprise Architect (Mar 2010 – Jan 2024)
- Citywide Network Total Cost of Ownership StudyA weighted scoring instrument for a manufacturer standard ahead of a refresh — which earned itself within three weeks, when a reseller's savings claim turned out to be priced against the wrong baseline.
- Enterprise AI Readiness AssessmentTwo years of technology review and systems analysis on where AI could fit a consolidated city-county government — and, as often, where it could not yet be defended.
- Ed Ball Hearing Room — Backup Council ChambersA committee room specified to run a City Council meeting if the Chamber were unavailable — which makes it a continuity facility for the legislative body, not a meeting room.
- Architecture Review BoardThe successor governance body, and the first with a budget attached — a five-to-ten year capital plan rather than a rolling list of purchases.
- Enterprise Multi-Tenant Firewall ArchitectureSix independently governed agencies on shared infrastructure, none able to reach, disrupt or inherit the regulatory exposure of any other.
- Infrastructure and Integration AutomationRecurring infrastructure and integration work automated on orchestration platforms, governed on the principle that automation multiplies the blast radius of a mistake.
- Consolidated CAD/911 Dispatch SystemTwo agencies with separate commands onto one dispatch platform, cutting response times from five to ten minutes down to one to two.
- Data Center Estate and Colocation ProgramSix tiered sites for the city and five external agencies — and a municipal IT department selling colocation against commercial carriers, and winning on engineering.
- Medical Examiner's Office Enterprise IntegrationNine subsystems federated through one bus across three sites, with the integration layer itself made redundant.
- CBM Cost Model and Customer Billing SystemA full technology budget allocated across every agency by measured consumption rather than negotiation — designed in 2012, first implemented in 2013, owned for eleven budget cycles.
- Security Posture, Incidents and Federal LiaisonWorking directly with the City's Chief Security Officer on posture, governance, attacks and breaches — and alongside Homeland Security and the FBI when an incident reached that far.
- Enterprise Fortinet IPS DeploymentVDOM-separated inline intrusion prevention at the enterprise core, with separate policy per internet path.
- JaxReady — Public Emergency Preparedness PlatformThe City's evacuation and flood zone lookup, on mobile and the public web — carried into the emergency public information chain, and tested as critical infrastructure rather than as a website.
- Enterprise Technology Budget ProgramA $48M to $62M annual technology budget, built and defended in public across thirteen cycles for a consolidated city-county government.
- Architecture by InfluenceA CIO's instruction — manage by influence rather than by headcount — and the fourteen years of practice built on it, in an estate where nothing could be mandated anyway.
- Proving Products Before Recommending ThemA standing part of the architecture function rather than an occasional exercise — pilot against the estate's own conditions, then hand it over with the operators trained.
- Holographic Display EvaluationEmerging display technology assessed on a borrow-before-buy basis, closed as a zero-dollar equipment evaluation award.
- NFL Stadium Cybersecurity ReviewA league Internal Audit assessment of the city-owned stadium against the Department of Homeland Security's stadium cybersecurity guidelines, reaching the building's control systems as much as its enterprise IT.
- Electronic Paper Tablet Assessment and RolloutA personal device that became a supported city endpoint — after the enterprise web filtering estate I had built turned out to be the thing breaking it.
- Clerk of the Court Filtering and DMZ ArchitectureA separate filtering estate and demilitarized zone for an independently governed constitutional officer sharing City facilities.
- Cecil Disaster Recovery Data CenterFacility and network design for the recovery site — power, cooling and carrier entry as well as what ran inside.
- Nine Years to an Integration PlatformA platform question carried across two evaluations and nine years — lost in 2014 to a vendor who could discount faster than a migration could be justified, and answered in 2023 by attaching it to a building.
- Solid Waste Systems ModernizationLegacy route, fleet and scalehouse systems replaced and integrated to cloud, sequenced around an operation with no slow season.
- Fire & Rescue Mobile Gateway and SD-WAN OverlayThree hundred apparatus turned into routed nodes on the enterprise network — dual carriers on private APNs, head-ends behind two providers, and a zero-trust overlay behind a firewall virtual system built for the fleet.
- Oracle ERP Program — RFP to Cloud Go-LiveTwelve years from the 2011 request for proposal to a 2020 cloud go-live — the cost model that had to exist first, and a cutover instrumented so neither side could blame the other.
- The Virtual Desktop PositionA decade of evaluation whose deliverable was a refusal — two platforms piloted and closed by change order, and an objection that held for eight years.
- Enterprise Network Access ControlSeven years from vendor evaluation to a control that could quarantine a port anywhere in the city — and the federated exception handling that made enforcement survivable in a building shared with four other agencies.
- Council Chamber ModernizationFour requisitions across eight years to rebuild one chamber — with the vote decoupled from the broadcast, verification moved before the session, and acceptance proven in live proceedings.
- E911 Caller Location and Backup Answering PointMaking the dispatcher see a room instead of a phone number — then building a second answering point so the dispatch center was not a single point of failure.
- FLGISA Cost Model ProgramTaking the City of Jacksonville's IT cost modeling, chargeback and allocation approach to peer jurisdictions across multiple conference years.
- Disaster Recovery Validation and Application TieringCriticality bound to recovery objectives in an instrument rather than a narrative, and a definition of "tested" that the estate could not yet meet — reported rather than softened.
- Republican National Convention — National Special Security EventCritical Infrastructure Subcommittee for a national special security event relocated to the city eight weeks into planning — first-responder mobility, venue design, carrier redundancy, and federal sensors landed on a municipal estate.
- Florida LambdaRail Regional ConsortiumFive independently governed public bodies onto the state research and education network, over fiber paths that could be proven separate.
- Parking Meter InfrastructureCommunications and back-end connectivity for street-level metering, with the traffic enforcement division.
- Annex to Main Data Center ConsolidationMoving one data center into another with the estate live throughout, on three design documents at revisions ten, twelve and ten.
- Public Records Request MethodologyThe workflow by which a citizen's request becomes produced records under Florida statute.
- Digital Divide Broadband PilotsHome internet for the lowest-income neighborhoods of Jacksonville, sited by demographic need rather than engineering convenience.
- Ed Austin State Attorney's OfficeNetwork infrastructure, VoIP telephony and building automation for the State Attorney's building.
- Comprehensive Performance Management — JaxOps, JaxAnalytics, JaxScoreThe division's flagship analytics program in three layers, ending in a public dashboard — where disclosed numbers constrain the model underneath rather than the presentation on top.
- Enterprise Business Intelligence Platform and CapabilityArchitecture authority over the City's analytics platform, held deliberately apart from the group that built the reports — with the capability hired and taught to a published standard.
- Fiber Proximity Web ApplicationA mapping tool answering which municipal fiber ran near a given address across a 220-location plant — where the engineering was straightforward and the data was not.
- St. James Building WirelessBuilding-wide wireless for City Hall, specified as a measurable coverage floor with heat maps as acceptance and the remediation cost carried by whoever promised the number.
- Telemedicine Program with Hospital PartnersDuval County Jail to UF Health — fifteen months from vendor presentation to completed pilot, opened with a business case rather than with equipment.
- One Spark Festival WirelessForty-two access points in downtown traffic signal cabinets, backhauled over the fiber that runs the lights, with Ubiquiti mesh between intersections as the fallback and a tenfold internet burst for the week.
- The SHA-2 Migration That Reached DispatchA routine certificate renewal that broke a live estate through its oldest endpoints, stopped station alerting in seventy-plus fire stations, and was resolved by deliberately keeping one service weak.
- Courthouse Trial BroadcastA controlled pooled broadcast out of a courtroom for high-profile trials — four cameras, coax to fiber through four floors, and a request to block cellular data on one antenna node while leaving voice alone.
Also worked in this period
The same engagements, filed under the other era they ran through.
- Reliability Engineering PracticeA reliability toolchain bought for one utility engagement in 2000, carried into a city estate, and still running twenty-three years later — availability as a computed number rather than a drawn assertion.
- Super Bowl XXXIX Surveillance Network and Command CenterThe transport and command center behind the video surveillance estate for the 2005 Super Bowl — evaluated, architected and overseen by the same person, deliberately.
- Super Bowl XXXIX Stadium WirelessTicketing and access control across seven stadium gates for the 2005 Super Bowl, backhauled over six point-to-point bridge pairs, in the most hostile radio environment there is.
- JEA Change Management SystemA web-based change management process and system designed from first principles, later carried to the City as the enterprise standard.