Owned tower and site design, RF propagation and multipath analysis, and disaster recovery for the regional radio system.
Redundancy had to survive the loss of a site, and had to be proven before a storm rather than during one. Seven emergency activations as Emergency Coordination Officer supplied the proof.
Tower and site construction was coordinated with the Federal Aviation Administration in a county carrying an international airport, an FAA-licensed spaceport and several airfields, which makes obstruction evaluation and height limits a design input rather than a permit. The constraint lands on antenna height, which is the one variable coverage most wants to increase.
Subtopics
- Tower & Antenna WorkClimbing the tower, mounting the antenna, running and terminating the feed line — and never designing a wireless site the same way afterwards.
Applied in
- First Coast Radio SystemRegional shared public safety radio across three system generations — original, retrofit, and full P25 replacement.
- Fayette County RF Propagation and Municipal Backhaul EvaluationPropagation and tower analysis for a West Virginia county, with backhaul evaluation for the municipal infrastructure that had to report over it.
Through subtopics
2 further projects reference a subtopic of this entry rather than the entry itself.
- Statewide Florida Wireless InstallationsTower, antenna and LMR feed line work across the state, alongside the RF design.
- Nassau County Sheriff's Office Countywide WirelessMulti-tower public safety wireless across a large rural county, surveyed by driving it and plotting the readings by hand.
See also
Also searched as
- LMR
- land mobile radio
- P25
- mission-critical push to talk
- trunked radio
- FirstNet