Owned tower and site design, RF propagation and multipath analysis, and disaster recovery for the regional radio system.
Redundancy had to survive the loss of a site, and had to be proven before a storm rather than during one. Seven emergency activations as Emergency Coordination Officer supplied the proof.
Applied in
- First Coast Radio SystemRegional shared public safety radio across three system generations — original, retrofit, and full P25 replacement.