Design and consolidation of data center estates, and the harder discipline of changing one while it is carrying production.
The Annex-to-main consolidation is the reference case: a temporary core built specifically to carry the firewall service modules and DMZ connections so the production cores could move in phases rather than in one window, both firewall modules held active/standby through the transition, and a migration onto a new firewall platform folded into the same effort. Layer 3 lifted off the server stacks onto a redundant switch pair with HSRP, point-to-point links reworked as trunks through an intermediary aggregate switch, and OSPF areas redesigned with authenticated adjacencies.
Subtopics
- Data Center Facility DesignThe power and cooling underneath the architecture — floor plans, rack elevations, containment, dual UPS and independent A/B electrical paths.
Applied in
- Client Architecture Portfolio88 numbered engagements across two years, twenty-plus live at any moment, across healthcare, manufacturing, financial services and the public sector — the inverse of nineteen years inside one estate, and a different problem.
- Healthcare EstatesFive providers — firewall and intrusion-prevention upgrades against an active vendor advisory, a multi-site data center fabric on standing retainer, and segmentation with virtual desktop.
- Diversified Industrial ManufacturerBusiness-unit and data center assessments, automated discovery and network assurance, an enterprise architecture review, and integration across two acquisitions.
- Enterprise Networking Practice LabThree repurposed servers being rebuilt into a 2.3 TB virtualized network emulation cluster, funded on a cost-per-month argument against a six-month procurement lead time — and the end of a practice running on engineers' own hardware.
- State and Local Government DeliveryA state transportation department data center relocation inside a single summer window, and county switching, firewall and platform replacement alongside it.
- Enterprise Core NetworkThe city's core network across nineteen years — architecture, standards and, when it mattered, hands on the equipment.
- Main Data Center Physical Connection LayoutThe as-built record of every port, patch and strand in the main data center — a naming convention where the identifier is the location, carried to revision 21 over fifteen years.
- Data Center Estate and Colocation ProgramSix tiered sites for the city and five external agencies — and a municipal IT department selling colocation against commercial carriers, and winning on engineering.
- Fourteen Weeks on the ToolsThe densest hands-on stretch of the NRI tenure — seven client engagements worked personally, in the configuration and the peer reviews and the customer calls, while taking over a team from the second day.
- Annex to Main Data Center ConsolidationMoving one data center into another with the estate live throughout, on three design documents at revisions ten, twelve and ten.
Through subtopics
4 further projects reference a subtopic of this entry rather than the entry itself.
- Citywide Network Total Cost of Ownership StudyA weighted scoring instrument for a manufacturer standard ahead of a refresh — which earned itself within three weeks, when a reseller's savings claim turned out to be priced against the wrong baseline.
- Cecil Disaster Recovery Data CenterFacility and network design for the recovery site — power, cooling and carrier entry as well as what ran inside.
- E911 Caller Location and Backup Answering PointMaking the dispatcher see a room instead of a phone number — then building a second answering point so the dispatch center was not a single point of failure.
- Duval County Courthouse Technology ProgramA $12M IT program inside a $350M, 800,000 square foot capital facility, cut over live to a fixed date.