Cisco DOCSIS Residential Cable Buildouts

Greenfield residential cable plant, headend policy, address management and voice — and one public address pool carrying thousands of residents.

Greenfield residential developments built in partnership with cable providers — North Hampton, South Hampton and several of the other Hampton communities, all of them under construction at once. The cable layout for the buildout, the fiber infrastructure feeding it, and the headend-side design that made residential broadband possible in areas that had none.

The work ran with the cabling contractors down to the physical level: establishing the pads and the routes that carried cable to each home, ahead of the streets and the houses, in the years before fiber to the home took over. Greenfield residential is a sequencing problem as much as an engineering one. The plant has to be in the ground before the development is finished, so the design has to be right the first time or it gets dug up.

The headend side

Termination and per-subscriber traffic policy on the Cisco cable routers — the customer-to-headend path in both directions, with downstream and upstream DOCSIS policy governing what each subscriber class was entitled to consume.

Downstream is the easy half. Upstream is where a residential plant actually fails, because the return path is shared, noisy and finite, and a policy that is generous in the wrong place degrades a whole segment rather than one house.

One pool, thousands of households

Carrier-grade translation ran for the whole subscriber base: thousands of residents across six properties sharing a public address pool, at a point when the alternative was buying routable space for every household and there was not enough of it to buy.

It ran on the CMTS itself rather than on a separate platform behind it, so subscriber termination, address assignment, per-subscriber policy and the translation state all sat on one box and competed for the same resources — which is the argument in miniature. Carrier-grade translation is a state problem rather than an addressing one. The table is finite and shared with everything else the platform is doing, the per-subscriber session ceiling decides who breaks first and which applications break for them, and once one public address serves many households the address stops identifying a household. That last part is a design consequence, not a footnote.

The Villages

The cable internet service for the residential buildout at The Villages, the master-planned community near Ocala, was delivered on Cisco cable modem routers with address management on Cisco Network Registrar. CNR carried DHCP and DNS across the estate and fed the translation underneath it: separate scopes for the modems themselves and for the subscriber equipment behind them, with the subscriber side sitting in the private space the CMTS then translated.

Address management is the unglamorous half of a subscriber network and the half that fails visibly, because a household does not experience a lease problem as a lease problem — they experience it as the internet being down. At buildout scale the scopes have to be laid out before the houses exist rather than extended once they do.

Voice on the same plant

Cisco CallManager delivered IP telephony to residences and to the community’s guard shacks alongside the cable internet service, so voice and data rode one infrastructure rather than two.

Putting telephony on a DOCSIS plant turns the upstream policy from a throughput question into a quality one. The return path is shared and contended, and voice does not degrade gracefully the way a download does, so the scheduling has to protect it before anything else gets what is left.

The guard shacks had no tolerance at all. A gatehouse that cannot make a call is an access control failure and a safety one, not a service complaint.

The Cisco Cable Communications Specialist, Deploying Quality of Service and IP Telephony examinations passed in 2003 are the three disciplines this one project needed.

Where it ran

Begun at Coleman Technologies and carried past that tenure. The developments, the headend design and the translation did not stop when the City of Jacksonville role began in April 2005 — they continued as side work under Michael Young Technologies, alongside the municipal estate by day. Subscriber-edge design is not a chapter that closed in 2005, which is also why the cable expert-track written examination sits in the same period.