CARE for system-level reliability and availability modeling, reliability block diagrams for series and parallel path analysis, and parts-count mean time between failures prediction against the MIL-HDBK-217, Telcordia and IEC reference libraries.
Engineering-discipline tooling rather than IT operations tooling, and the difference is the whole point. Monitoring reports how a system performed after it failed. This answers whether a design will meet an availability target before anything is built.
Bought in 2000 for the JEA SCADA work and carried into the City of Jacksonville estate, where it stayed in use for seventeen years.
Where it appears
Declared on each entry rather than listed here, so this page cannot drift from the work it describes. What each entry named is quoted as it stands, with how much of that project rested on it and what stands behind the claim beside it. The first of those drives the height of the surface above.
Coleman Technologies (subsequently acquired; now Presidio)
- JEA Utility SCADA and Redundant Control Sites2000–2004CARE reliability analysis, run before the designthe project had no deliverable without itdocumented at the time
- Reliability Engineering Practice2000–2023CARE · reliability block diagrams · parts-count MTBF against MIL-HDBK-217, Telcordia and IECthe project had no deliverable without itdocumented at the time